Control Column

One of the more difficult tasks was getting the washers in between this tight area on the control column.  You had to do it on both sides of the bolt.  I created my “tool” out of scrap aluminum and used double tape to keep it on the tool until I had it in place for the bolt, then yanked the tool loose from the washer.  Worked well, just took a while to get the right size washers in that area so there was no left to right slack in the stick.  Perfect, no left to right movement at all.

IMG_4055

IMG_4056